The rails upon which the solar modules will be mounted were installed this week. Here is the before:
And here is the after:
The rails are heavy duty aluminum. L-shaped mounts attach to the roof every 4 feet. The L-feet are attached to the roof by lag screw driven into a truss. Sealant is applied to the lag screw and to the bottom of each L. Altogether, it took about 5 hours to install the rails with two roofers, one rail assemblyman (me), and one 'supervisor'. (That's a 40° roof! There was no way I was going to get up there.
The conduit for the DC power leads will run just under the edge of the roof in the soffit.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment